[{"data":1,"prerenderedAt":654},["ShallowReactive",2],{"{}site-settings":3,"{}grid-safe-ai-ups-technology":217},{"data":4,"headers":195},{"story":5,"cv":192,"rels":193,"links":194},{"name":6,"created_at":7,"published_at":8,"updated_at":9,"id":10,"uuid":11,"content":12,"slug":182,"full_slug":182,"sort_by_date":183,"position":184,"tag_list":185,"is_startpage":186,"parent_id":187,"meta_data":183,"group_id":188,"first_published_at":189,"release_id":183,"lang":190,"path":183,"alternates":191,"default_full_slug":183,"translated_slugs":183},"Site Settings","2025-10-26T15:56:50.232Z","2026-07-24T18:15:03.417Z","2026-07-24T18:15:03.428Z",105695683846357,"4c8e9d92-1edc-43b6-acf8-d4b25494530e",{"_uid":13,"footer":14,"component":133,"menu_links":134},"19acaafb-2e78-4728-8406-3de8db1b419e",[15],{"_uid":16,"copy":17,"type":18,"links":19,"footnote":100,"component":101,"legal_links":102,"social_links":121},"eadd5892-45b1-423f-975f-a283450580b7","Energy is complicated. Reaching us isn’t. Contact the ON team anytime.","",[20,46,62,68,74,88,94],{"_uid":21,"label":22,"links":23,"component":45},"5959ec1d-7e4a-4588-9ed7-73d13ba1142a","Expertise",[24,33,39],{"_uid":25,"link":26,"type":18,"label":31,"component":32},"0373bcfc-18fc-4062-8c79-406525627b6e",{"id":27,"url":18,"linktype":28,"fieldtype":29,"cached_url":30},"3bb95d1c-e4cf-418b-b172-7b0d6916ee67","story","multilink","expertise/ai-workloads","AI Workload","text_link",{"_uid":34,"link":35,"type":18,"label":38,"component":32},"daf0437f-3b56-4e15-b6f2-944ace7bd7b6",{"id":36,"url":18,"linktype":28,"fieldtype":29,"cached_url":37},"4c7024be-6cf2-4ee9-8c99-bbd2f206d709","expertise/grid-volatility","Grid Volatility",{"_uid":40,"link":41,"type":18,"label":44,"component":32},"261bdf07-6062-4a81-8787-226a964a48b5",{"id":42,"url":18,"linktype":28,"fieldtype":29,"cached_url":43},"df345d16-5903-43fa-95f9-c62a5c34db7d","expertise/power-quality","Power Quality","text_link_group",{"_uid":47,"label":48,"links":49,"component":45},"c0168764-9a79-4a2e-929a-50cffa67eb24","Solutions",[50,56],{"_uid":51,"link":52,"label":55,"component":32},"4bbe24a7-8bd5-4b11-b056-e98f88a8ae17",{"id":53,"url":18,"linktype":28,"fieldtype":29,"cached_url":54},"90021c9f-3bad-4de0-a61c-b9a1966f5966","technology","Technology",{"_uid":57,"link":58,"label":61,"component":32},"99babf60-118c-46a1-b130-105411a325f0",{"id":18,"url":59,"linktype":60,"fieldtype":29,"cached_url":59},"https://www.on.energy/technology/grid-safe-ai-ups-white-paper","url","AI UPS White Paper",{"_uid":63,"link":64,"label":67,"component":32},"6bb83fb5-b21e-4725-8b77-d84d7bbbeb01",{"id":65,"url":18,"linktype":28,"fieldtype":29,"cached_url":66},"24195934-cf31-4d70-ba62-01438ca03698","financing","Financing",{"_uid":69,"link":70,"label":73,"component":32},"117f92ea-905c-4e8f-b5a5-37c832e36da2",{"id":71,"url":18,"linktype":28,"fieldtype":29,"cached_url":72},"1ff359b0-095e-431b-a8c5-d63044216787","team","Team",{"_uid":75,"label":76,"links":77,"component":45},"02b9c621-c507-4c3b-850f-e7949e2cb16c","News",[78,83],{"_uid":79,"link":80,"label":76,"component":32},"83b7528f-2e65-413c-b8b0-745be2ae6f0e",{"id":81,"url":18,"linktype":28,"fieldtype":29,"cached_url":82},"1ae16129-6dcb-4be0-a1d4-32d83d4d9d29","news",{"_uid":84,"link":85,"label":87,"component":32},"d6703054-e361-461c-8b84-b9a46778eb2c",{"id":18,"url":86,"linktype":60,"fieldtype":29,"cached_url":86},"news/regulatory","Regulatory",{"_uid":89,"link":90,"label":93,"component":32},"6d2a93d4-869e-4491-8e3d-0c5df0a9cd25",{"id":18,"url":91,"target":92,"linktype":60,"fieldtype":29,"cached_url":91},"https://job-boards.greenhouse.io/onenergy","_blank","Careers",{"_uid":95,"link":96,"label":99,"component":32},"63325033-dd83-423b-b2e1-5de92ee83dcb",{"id":97,"url":18,"linktype":28,"fieldtype":29,"cached_url":98},"ad463f2c-45c4-4ea1-ae8c-2d4fe71a83aa","contact","Contact","© 2026 All rights reserved, ON Energy Storage, Inc.","footer",[103,109,115],{"_uid":104,"link":105,"label":108,"component":32},"6ab140dc-80d8-48a3-b09a-cb34a8937aa0",{"id":106,"url":18,"linktype":28,"fieldtype":29,"cached_url":107},"5f2ab792-c926-45af-bbf5-ae1e2e4b9024","patents","Patents",{"_uid":110,"link":111,"type":18,"label":114,"component":32},"3b82685f-2fa6-4065-a9ea-4f1a2d44bc4e",{"id":112,"url":18,"linktype":28,"fieldtype":29,"cached_url":113},"d6793b1b-267a-4f27-93d7-f92a664fbd47","privacy-policy","Privacy Policy",{"_uid":116,"link":117,"type":18,"label":120,"component":32},"60b7689e-dae6-40dc-b3eb-b672373bd589",{"id":118,"url":18,"linktype":28,"fieldtype":29,"cached_url":119},"728da0ae-3ba9-40d2-9138-77b4afff3b52","terms-of-use","Terms of Use",[122,128],{"_uid":123,"link":124,"type":18,"platform":126,"component":127},"44a87440-d6fc-4c22-98cb-067584be824c",{"id":18,"url":125,"target":92,"linktype":60,"fieldtype":29,"cached_url":125},"https://www.linkedin.com/company/on-es/","linkedin","social_link",{"_uid":129,"link":130,"type":18,"platform":132,"component":127},"d7e4b54c-a6cf-4b16-af28-0fdbc6ab1ba7",{"id":18,"url":131,"target":92,"linktype":60,"fieldtype":29,"cached_url":131},"http://youtube.com/@On.Energy","youtube","site_settings",[135,148,160,163,173],{"_uid":136,"label":22,"links":137,"component":45},"79d4d0cf-38b0-44ab-a38a-cb958a26dc38",[138,142,145],{"_uid":139,"link":140,"type":18,"label":141,"component":32},"2e72f2eb-d637-4a8e-8ff7-e096d474131e",{"id":27,"url":18,"linktype":28,"fieldtype":29,"cached_url":30},"AI Workloads",{"_uid":143,"link":144,"type":18,"label":38,"component":32},"17943f27-7aa2-4db5-8535-35a31d348b34",{"id":36,"url":18,"linktype":28,"fieldtype":29,"cached_url":37},{"_uid":146,"link":147,"type":18,"label":44,"component":32},"c2bee2e4-9cf7-420a-961b-47aadd76cea5",{"id":42,"url":18,"linktype":28,"fieldtype":29,"cached_url":43},{"_uid":149,"label":48,"links":150,"component":45},"5573654c-aa46-4746-902b-32057dbc362e",[151,155],{"_uid":152,"link":153,"label":55,"component":32},"6f60ab4c-254a-40a3-af26-4c55e72834c5",{"id":53,"url":18,"target":154,"linktype":28,"fieldtype":29,"cached_url":54},"_self",{"_uid":156,"link":157,"label":159,"component":32},"0fe533d1-dcee-425f-95c9-5f6a11427072",{"id":18,"url":158,"linktype":60,"fieldtype":29,"cached_url":158},"https://www.on.energy/solutions/grid-safe-ai-ups-technology","AI UPS",{"_uid":161,"link":162,"label":67,"component":32},"7fa934f6-96c7-4ff7-bd57-141b69b5641d",{"id":65,"url":18,"linktype":28,"fieldtype":29,"cached_url":66},{"_uid":164,"label":165,"links":166,"component":45},"623a733a-d5ed-48f2-8610-9a981cc4ed33","About",[167,170],{"_uid":168,"link":169,"label":73,"component":32},"0dd5e9f0-6a0d-436a-b3ca-f7a27d02ba89",{"id":71,"url":18,"target":154,"linktype":28,"fieldtype":29,"cached_url":72},{"_uid":171,"link":172,"label":93,"component":32},"82ecc104-28bd-4c5a-ba2c-eda5a3e9ba64",{"id":18,"url":91,"target":92,"linktype":60,"fieldtype":29,"cached_url":91},{"_uid":174,"label":76,"links":175,"component":45},"d786c57e-fb25-4d41-af6b-e1745468343c",[176,179],{"_uid":177,"link":178,"label":76,"component":32},"5ee23b04-4231-4963-afb8-c79c27ead3cd",{"id":81,"url":18,"linktype":28,"fieldtype":29,"cached_url":82},{"_uid":180,"link":181,"label":87,"component":32},"edb7b1cc-dd5c-4346-bd24-30c88a321653",{"id":18,"url":86,"linktype":60,"fieldtype":29,"cached_url":86},"site-settings",null,40,[],false,0,"585b6bbf-7190-4ee6-8f3e-8e9ad4976964","2025-10-26T15:58:19.504Z","default",[],1784922642,[],[],{"cache-control":196,"connection":197,"content-encoding":198,"content-type":199,"date":200,"etag":201,"referrer-policy":202,"sb-be-version":203,"server":204,"transfer-encoding":205,"vary":206,"via":207,"x-amz-cf-id":208,"x-amz-cf-pop":209,"x-cache":210,"x-content-type-options":211,"x-frame-options":212,"x-permitted-cross-domain-policies":213,"x-request-id":214,"x-runtime":215,"x-xss-protection":216},"max-age=0, public, s-maxage=604800, stale-if-error=3600","keep-alive","gzip","application/json; charset=utf-8","Fri, 24 Jul 2026 19:54:11 GMT","W/\"6ac3ae2d99ae236b36fb327930e2b9c0\"","strict-origin-when-cross-origin","5.924.0","nginx/1.29.1","chunked","Origin,Accept-Encoding","1.1 ef315c477bb47c8fcfecf9e0377b18b0.cloudfront.net (CloudFront)","lnwWqImy9I91awcU7uCye2Iq938i2Vp3d0tP8DbO242uBiY9HnX1DQ==","IAD55-P6","Miss from cloudfront","nosniff","SAMEORIGIN","none","d059e0a8-0805-441b-9503-d43686295f3a","0.033639","0",{"data":218,"headers":647},{"story":219,"cv":192,"rels":645,"links":646},{"name":220,"created_at":221,"published_at":222,"updated_at":223,"id":224,"uuid":225,"content":226,"slug":638,"full_slug":638,"sort_by_date":183,"position":639,"tag_list":640,"is_startpage":186,"parent_id":183,"meta_data":183,"group_id":641,"first_published_at":642,"release_id":183,"lang":190,"path":643,"alternates":644,"default_full_slug":183,"translated_slugs":183},"Grid-Safe AI UPS White Paper","2026-06-10T12:14:26.269Z","2026-07-24T19:50:41.544Z","2026-07-24T19:50:41.559Z",185975055476551,"cf915bde-7519-4da7-9571-2eaa028d7fb4",{"seo":227,"_uid":236,"component":237,"hero_meta":238,"about_lead":256,"hero_image":257,"hero_title":262,"about_label":263,"about_stats":264,"about_title":290,"summary_copy":291,"testbed_copy":306,"testbed_lead":318,"hero_overline":319,"hero_subtitle":320,"solution_lead":321,"summary_label":322,"summary_title":323,"testbed_image":324,"testbed_label":329,"testbed_stats":330,"testbed_title":346,"about_cta_copy":347,"economics_lead":348,"solution_label":349,"solution_stats":350,"solution_title":365,"about_cta_title":366,"challenge_cards":367,"challenge_label":417,"challenge_title":418,"compliance_lead":419,"economics_label":420,"economics_title":421,"standards_label":422,"standards_title":423,"transients_lead":424,"compliance_label":425,"compliance_title":426,"standards_groups":427,"testbed_why_copy":441,"transients_cards":448,"transients_label":473,"transients_title":474,"architecture_lead":475,"testbed_why_title":476,"about_version_note":477,"architecture_label":478,"architecture_nodes":479,"architecture_specs":505,"architecture_title":536,"about_cta_link_label":537,"compliance_aiups_copy":538,"compliance_lvups_copy":539,"solution_capabilities":540,"compliance_aiups_title":563,"compliance_lvups_title":564,"economics_revenue_cards":565,"compliance_realdata_copy":591,"transients_realdata_copy":592,"compliance_realdata_label":593,"compliance_realdata_title":594,"economics_comparison_rows":595,"transients_realdata_label":628,"transients_realdata_title":594,"challenge_traditional_copy":629,"economics_comparison_title":636,"challenge_traditional_title":637,"compliance_realdata_footnote":18},[228],{"_uid":229,"image":230,"title":233,"component":234,"description":235},"cb6a31fe-5091-4f3e-b1bc-b89e84384383",{"id":183,"alt":183,"name":18,"focus":183,"title":183,"source":183,"filename":18,"copyright":183,"fieldtype":231,"meta_data":232},"asset",{},"AI UPS™ Grid-Safe Technology | ON.energy","seo","AI UPS™ — a grid-safe, medium-voltage UPS with integrated BESS that delivers zero transfer time, full GPU power filtering, ERCOT ZVRT compliance, and grid revenue generation for hyperscale data centers.","9c418018-a1f1-4bbd-9454-5fad6c15dc63","white_paper_page",[239,244,248,252],{"_uid":240,"label":241,"value":242,"component":243},"8e98f4fd-c5d4-462c-b214-90e310242d46","Transfer Time","Zero","hero_meta_item",{"_uid":245,"label":246,"value":247,"component":243},"05bce1d5-3b85-454e-a559-a41425a02716","Per Module","3.2 MW",{"_uid":249,"label":250,"value":251,"component":243},"ed2c21f7-3449-4f36-969a-85d8d4670210","Backup Duration","1–8+ hrs",{"_uid":253,"label":254,"value":255,"component":243},"8c74f49c-fd6e-4f11-95a6-07e0301abf36","Site Scalability","Multi-GW","ON.energy builds and operates hyperscale power systems to solve the toughest resilience challenges. AI&nbsp;UPS™ is built on grid-scale power conversion and energy storage technology deployed in the hundreds of gigawatts worldwide.",{"id":258,"alt":259,"name":18,"focus":18,"title":18,"source":18,"filename":260,"copyright":18,"fieldtype":231,"meta_data":261,"is_external_url":186},185984994198681,"ON.energy AI UPS™ medium-voltage system render","https://a.storyblok.com/f/288034353253643/2000x1054/3ad872b559/ai-ups-render.jpg",{"alt":259,"title":18,"source":18,"copyright":18},"AI UPS\u003Cspan class=\"highlight\">™\u003C/span>\u003Cbr/>Grid-Safe\u003Cbr/>Technology","10 — ABOUT ON.energy",[265,270,274,278,282,286],{"_uid":266,"label":267,"value":268,"component":269},"4cb4898a-3aa9-4b21-b6f7-31a1c3a0a933","Operating & Under Construction","3 GW+","stat_item",{"_uid":271,"label":272,"value":273,"component":269},"1143da4d-61de-4f27-ae6b-862d9aa9e7e7","Production Capacity","10+ GW",{"_uid":275,"label":276,"value":277,"component":269},"502a4a1c-6258-4aaa-97a5-ffb69afb6aaa","Projects Across Americas","75+",{"_uid":279,"label":280,"value":281,"component":269},"f3d35998-cf8e-4da0-8631-61354ac25c25","Uptime Performance","&gt;99.9%",{"_uid":283,"label":284,"value":285,"component":269},"305ec761-d2d0-4234-a97e-a9161b2fa43c","Tier-1 Component Warranties","20 yr",{"_uid":287,"label":288,"value":289,"component":269},"3c4ec0db-a8bd-4a1b-bd91-1d33bbe238f3","Manufacturing, FEOC Compliant","U.S.","Proven Technology\u003Cbr/>Foundation",{"type":292,"content":293},"doc",[294,301],{"type":295,"attrs":296,"content":297},"paragraph",{"textAlign":183},[298],{"text":299,"type":300},"As data center workloads shift toward AI and HPC, operators face a dual challenge: protecting sensitive, volatile compute loads from grid disturbances while ensuring the facility itself does not destabilize the local grid.","text",{"type":295,"attrs":302,"content":303},{"textAlign":183},[304],{"text":305,"type":300},"AI UPS™ solves this paradox — decoupling the load from the grid so that massive compute transients never disrupt the grid, and grid faults never disrupt the compute.",{"type":292,"content":307},[308,313],{"type":295,"attrs":309,"content":310},{"textAlign":183},[311],{"text":312,"type":300},"¶ The ARIES Flatirons Campus provides hardware-in-the-loop testing at up to 20 MW with voltage levels reaching 13.2 kV - representing the real-world distribution and bulk power system interface. The facility offers two controllable grid interfaces: a 7 MW grid simulator that replicates utility grid behavior including disturbances and voltage ride-through events, and a 20 MW load simulator with 400-microsecond response times that reproduces real-world demand dynamics. AI UPS™ connects at medium voltage to both interfaces.",{"type":295,"attrs":314,"content":315},{"textAlign":183},[316],{"text":317,"type":300},"¶ This enables ON.energy to prove AI UPS™ transient response and load smoothing performance under the most demanding conditions — including voltage ride-through events, frequency excursions, and rapid load transients — under controlled, repeatable conditions with GPS-synchronized medium-voltage data acquisition at every node.","AI&nbsp;UPS™ has been validated at full scale through the ARIES (Advanced Research on Integrated Energy Systems) platform - a world-class research infrastructure operated by the National Laboratory of the Rockies at its Flatirons Campus in Colorado.","ON.energy","Ensuring uninterruptible power and grid compliance for mission-critical data centers. A patented, medium-voltage solution for the AI era.","AI&nbsp;UPS™ delivers a comprehensive solution through a single integrated system — continuously conditioning all power flowing to the facility while presenting a compliant profile to the grid.","01 — EXECUTIVE SUMMARY","The AI / Grid Paradox",{"id":325,"alt":326,"name":18,"focus":18,"title":18,"source":18,"filename":327,"copyright":18,"fieldtype":231,"meta_data":328,"is_external_url":186},185997326467386,"ON.energy AI UPS™ system deployed at the NLR Flatirons Campus","https://a.storyblok.com/f/288034353253643/2836x1089/3998497786/nlr-ai-ups.jpg",{"alt":326,"title":18,"source":18,"copyright":18},"04 — FULL-SCALE VALIDATION",[331,335,339,342],{"_uid":332,"label":333,"value":334,"component":269},"7316473b-15c8-4392-995f-1cf1e1ef788e","Grid Simulator (grid disturbances &amp; ride-through)","7 MW",{"_uid":336,"label":337,"value":338,"component":269},"696e5aa8-02d8-466e-96d2-c9ded2e8aec8","Load Simulator (400 &micro;s response time)","20 MW",{"_uid":340,"label":341,"value":247,"component":269},"69c1ad68-cfcb-4d7b-a63b-cd3f50cf4f66","Full Branch Under Test",{"_uid":343,"label":344,"value":345,"component":269},"6c219476-94ef-41bb-8e55-a0ed1c126c64","Medium-Voltage Connection","13.2 kV","Proven at the National\u003Cbr/>Laboratory of the Rockies","For technical inquiries, system sizing, or project discussions, our engineering team is ready to design a solution for your facility.","AI&nbsp;UPS™ transforms what is traditionally a cost center into a revenue generator through participation in grid services.","03 — AI UPS™ SOLUTION",[351,354,358,362],{"_uid":352,"label":241,"value":353,"component":269},"e20aa966-be2a-4097-b4b8-3b43906d0a96","0 ms",{"_uid":355,"label":356,"value":357,"component":269},"4bd5b331-0da5-4ac5-800e-f3e350f2b930","Environmental Rating","IP55",{"_uid":359,"label":360,"value":361,"component":269},"b6739336-c3b5-49e9-8864-891d65bd58fa","Monitoring & Support","24/7",{"_uid":363,"label":280,"value":364,"component":269},"31ff0b56-b295-4eef-8afc-d454dff3ba2c",">99.9%","Unified Power Protection\u003Cbr/>and Grid Integration","Ready to Transform Your Power Architecture with AI UPS™?",[368,377,385,393,401,409],{"_uid":369,"copy":370,"icon":371,"title":373,"component":376},"7192e74c-a1d8-46ec-9ce7-e8886455e8de","GPU clusters ramp from idle to full load in milliseconds, creating power swings beyond traditional system tolerance.",{"id":372,"alt":373,"name":18,"focus":18,"title":18,"source":18,"filename":374,"copyright":18,"fieldtype":231,"meta_data":375,"is_external_url":186},185988647691681,"Rapid Load Transients","https://a.storyblok.com/f/288034353253643/199x199/a6e7968662/volt.svg",{"alt":373,"title":18,"source":18,"copyright":18},"icon_feature_card",{"_uid":378,"copy":379,"icon":380,"title":382,"component":376},"5442bed9-c2d0-43e1-830f-6fd5a60ca29d","Training runs worth millions in compute time can be lost to momentary power disturbances.",{"id":381,"alt":382,"name":18,"focus":18,"title":18,"source":18,"filename":383,"copyright":18,"fieldtype":231,"meta_data":384,"is_external_url":186},185989083801017,"Zero Tolerance for Interruption","https://a.storyblok.com/f/288034353253643/199x199/ad11c7ff55/sheild.svg",{"alt":382,"title":18,"source":18,"copyright":18},{"_uid":386,"copy":387,"icon":388,"title":390,"component":376},"0a46c7d5-3233-4acc-ab42-e4010c41fa5c","Giga-campus deployments demand multi-GW power systems that break the traditional low-voltage UPS architecture mold.",{"id":389,"alt":390,"name":18,"focus":18,"title":18,"source":18,"filename":391,"copyright":18,"fieldtype":231,"meta_data":392,"is_external_url":186},185989465282022,"Unprecedented Scale","https://a.storyblok.com/f/288034353253643/199x199/f26b25a722/scale.svg",{"alt":390,"title":18,"source":18,"copyright":18},{"_uid":394,"copy":395,"icon":396,"title":398,"component":376},"70df4856-3404-4d57-8c2b-28d3c9485acd","Facilities must remain connected during grid disturbances rather than disconnecting and causing cascading failures.",{"id":397,"alt":398,"name":18,"focus":18,"title":18,"source":18,"filename":399,"copyright":18,"fieldtype":231,"meta_data":400,"is_external_url":186},185989953148420,"Voltage Ride-Through","https://a.storyblok.com/f/288034353253643/199x199/cd5a8d5e00/double-arrow.svg",{"alt":398,"title":18,"source":18,"copyright":18},{"_uid":402,"copy":403,"icon":404,"title":406,"component":376},"8a16d3a0-3e2d-4bed-ba83-42416a9eba3b","Similar requirements apply during frequency excursions across both 50 Hz and 60 Hz systems.",{"id":405,"alt":406,"name":18,"focus":18,"title":18,"source":18,"filename":407,"copyright":18,"fieldtype":231,"meta_data":408,"is_external_url":186},185990296225298,"Frequency Ride-Through","https://a.storyblok.com/f/288034353253643/199x199/c4837afc56/arrow-1.svg",{"alt":406,"title":18,"source":18,"copyright":18},{"_uid":410,"copy":411,"icon":412,"title":414,"component":376},"e92ff24f-553d-41ae-a0f8-319eaa94d3be","Large loads cannot appear or disappear instantaneously from the grid's perspective.",{"id":413,"alt":414,"name":18,"focus":18,"title":18,"source":18,"filename":415,"copyright":18,"fieldtype":231,"meta_data":416,"is_external_url":186},185990664488546,"Ramp Rate Control","https://a.storyblok.com/f/288034353253643/199x199/0bddf6a160/arrow-2.svg",{"alt":414,"title":18,"source":18,"copyright":18},"02 — THE CHALLENGE","Converging Power Requirements","AI&nbsp;UPS™ meets and exceeds the most stringent ride-through requirements currently proposed or in effect, including ERCOT's Large Load Voltage Ride-Through (LLVRT) standards.","08 — ECONOMIC VALUE","Beyond Backup:\u003Cbr/>Grid Services Revenue","09 — COMPLIANCE & STANDARDS","Industry Standards\u003Cbr/>Compliance","Modern AI workloads create power swings of ±70% of interconnection capacity within milliseconds. AI&nbsp;UPS™ completely decouples the facility's internal load behavior from its grid-facing power profile.","05 — GRID COMPLIANCE","Voltage &amp; Frequency\u003Cbr/>Ride-Through",[428,433,437],{"_uid":429,"items":430,"title":431,"component":432},"68b0e9f8-b1d3-466d-92ef-216fa6556fb6","IEEE 1547 - Distributed Energy Resources\nERCOT NOGRR282 - Large Load Requirements\nPJM, CAISO, MISO regional requirements","Grid Interconnection","standards_group",{"_uid":434,"items":435,"title":436,"component":432},"32c7f658-9c36-412f-a852-2424095a834b","Uptime Institute Tier III/IV\nTIA-942 Infrastructure Standards\nASHRAE TC 9.9 Environmental Guidelines\nIEC 62040-3 Class 1 UPS Performance","Data Center",{"_uid":438,"items":439,"title":440,"component":432},"f1bd6800-65b4-4ab8-9652-cc360c5f76ba","UL 1741 - Inverters & Interconnection\nUL 9540 - Energy Storage Systems Safety\nIEEE 1584 - Arc-Flash Hazard\nNFPA 70 - National Electrical Code","Electrical Safety",{"type":292,"content":442},[443],{"type":295,"attrs":444,"content":445},{"textAlign":183},[446],{"text":447,"type":300},"Unlike lab-scale demonstrations, the Flatirons Campus tests AI UPS™ at the actual voltages, power levels, and grid conditions it will face in production deployments. ON.energy is running a full 3.2 MW branch through the most stringent load profiles in the industry, proving transient response and load smoothing performance at scale. The facility's digital real-time simulators - the largest in any R&D environment - scale test results to represent community and regional grid configurations, validating performance across every scenario before a single unit ships to a customer site.",[449,457,465],{"_uid":450,"copy":451,"icon":452,"title":454,"component":376},"989de55e-8cff-41bf-8621-1e414de13c82","Rapid load changes absorbed using integrated energy storage with minimal (\u003C1%) battery state of charge variation.",{"id":453,"alt":454,"name":18,"focus":18,"title":18,"source":18,"filename":455,"copyright":18,"fieldtype":231,"meta_data":456,"is_external_url":186},186001879905155,"Absorb","https://a.storyblok.com/f/288034353253643/199x199/1cc682e649/data.svg",{"alt":454,"title":18,"source":18,"copyright":18},{"_uid":458,"copy":459,"icon":460,"title":462,"component":376},"e588f089-d108-4b37-a4fa-119b11f30aa5","Presents a smooth, predictable power profile to the grid regardless of internal workload behavior.",{"id":461,"alt":462,"name":18,"focus":18,"title":18,"source":18,"filename":463,"copyright":18,"fieldtype":231,"meta_data":464,"is_external_url":186},186002176340900,"Smooth","https://a.storyblok.com/f/288034353253643/199x199/6ec4e5349d/eye.svg",{"alt":462,"title":18,"source":18,"copyright":18},{"_uid":466,"copy":467,"icon":468,"title":470,"component":376},"2e1952c8-1e54-4250-95b9-5c51311c099a","Maintains ramp rate compliance automatically, protecting grid infrastructure from stress.",{"id":469,"alt":470,"name":18,"focus":18,"title":18,"source":18,"filename":471,"copyright":18,"fieldtype":231,"meta_data":472,"is_external_url":186},186002398471096,"Comply","https://a.storyblok.com/f/288034353253643/199x199/cf6d882738/check.svg",{"alt":470,"title":18,"source":18,"copyright":18},"06 — TRANSIENT MANAGEMENT","AI Workload Transient\u003Cbr/>Management","Each data hall receives an independent AI&nbsp;UPS™ system with built-in redundancy - ensuring fault isolation, independent maintenance, and scalable deployment.","Why This Matters","Document Version 1.0 • 2026 • Public Distribution Permitted","07 — SYSTEM ARCHITECTURE",[480,489,497],{"_uid":481,"desc":482,"icon":483,"title":485,"component":488,"highlight":186},"bbdbaba1-7043-47a3-a538-f908043dfc9f","Medium Voltage Feed ",{"id":484,"alt":485,"name":18,"focus":18,"title":18,"source":18,"filename":486,"copyright":18,"fieldtype":231,"meta_data":487,"is_external_url":186},186003533972510,"Utility Grid","https://a.storyblok.com/f/288034353253643/199x199/a886c84ee8/grid.svg",{"alt":485,"title":18,"source":18,"copyright":18},"arch_node",{"_uid":490,"desc":491,"icon":492,"title":494,"component":488,"highlight":186},"6c454960-be0f-4c68-a314-eb5017553739","3.2 MW Modules\u003Cbr/>N+1 to 2N+1",{"id":493,"alt":494,"name":18,"focus":18,"title":18,"source":18,"filename":495,"copyright":18,"fieldtype":231,"meta_data":496,"is_external_url":186},186004008297525,"AI UPS™","https://a.storyblok.com/f/288034353253643/199x199/541c673cce/energy.svg",{"alt":494,"title":18,"source":18,"copyright":18},{"_uid":498,"desc":499,"icon":500,"title":502,"component":488,"highlight":186},"19524e58-cb34-4dd9-816b-fc72433c8e4c","Clean, Uninterrupted Power",{"id":501,"alt":502,"name":18,"focus":18,"title":18,"source":18,"filename":503,"copyright":18,"fieldtype":231,"meta_data":504,"is_external_url":186},186004232258624,"Facility","https://a.storyblok.com/f/288034353253643/199x199/1845136ff7/system.svg",{"alt":502,"title":18,"source":18,"copyright":18},[506,510,514,518,522,526,530,533],{"_uid":507,"spec":356,"value":508,"component":509},"cbd7a6d5-8ce1-44fa-beba-febb85efea9e","IP55 (outdoor rated)","spec_row",{"_uid":511,"spec":512,"value":513,"component":509},"b93a3325-8290-4f66-97d8-e39445db2c0b","Installation Location","Upstream of facility switchgear",{"_uid":515,"spec":516,"value":517,"component":509},"26ea7678-5070-4002-ab0a-31898d520783","Design","Compact modular",{"_uid":519,"spec":520,"value":521,"component":509},"5c1aeca4-1d86-4c16-9ca1-366c4bacc037","Cooling","Self-contained, no building integration",{"_uid":523,"spec":524,"value":525,"component":509},"1fc3b058-62c2-447e-afce-e9f89e97a255","Maintenance","Full access from grade level",{"_uid":527,"spec":528,"value":529,"component":509},"cb1667b0-4181-475c-b4e6-7e7ef1e8bac2","Base Module","3.2 MW power capacity",{"_uid":531,"spec":254,"value":532,"component":509},"0b680f94-523e-40f8-9c95-4dae10694344","Unlimited - multi-GW supported",{"_uid":534,"spec":250,"value":535,"component":509},"680dd591-cb85-4b5c-b54d-bc35369cfac2","1–8+ hours per configuration","Modular Design\u003Cbr/>at Any Scale","Get in Touch","AI&nbsp;UPS™ dramatically exceeds ERCOT compliance - riding through 0V continuously for the duration of the BESS (1+ hour), and sustaining 120% voltage for 12 seconds.","Traditional low-voltage UPS systems fail to meet ERCOT's Large Load ride-through requirements - leaving critical areas of non-compliance at low voltages.",[541,545,548,551,555,559],{"_uid":542,"component":543,"capability":241,"performance":544},"2ee44d73-7f52-4b14-9f7f-eb1fe5c4a355","capability_row","Zero (continuous power conversion)",{"_uid":546,"component":543,"capability":44,"performance":547},"fe6fa9cf-3755-4535-b6bf-d098b0188de2","Complete isolation from grid disturbances",{"_uid":549,"component":543,"capability":250,"performance":550},"8ff42f69-931d-4380-be82-1e9c354e7c8f","1–8+ hours (configurable)",{"_uid":552,"component":543,"capability":553,"performance":554},"fa72cfc7-6b19-49d3-9e37-ace8407988fb","Scalability","3.2 MW per module to multi-GW per site",{"_uid":556,"component":543,"capability":557,"performance":558},"9392185b-12ea-4326-9f32-21a38e38ae7b","Redundancy","N+1 to 2N+1 configurations",{"_uid":560,"component":543,"capability":561,"performance":562},"be601975-a825-4046-8c5d-18cf9cfe25b3","Installation","Outdoor-rated (IP55), upstream of facility","AI&nbsp;UPS™ (MV UPS)","LV UPS (Competitor)",[566,573,579,585],{"_uid":567,"copy":568,"range":569,"title":570,"component":571,"bar_percent":572},"e8669c47-2f21-44fc-8ffa-85ed27e5c855","Reduce facility demand charges by limiting grid draw during peak periods. Store low-cost energy during off-peak hours.","15–30% demand charge reduction","Peak Shaving","revenue_card","30",{"_uid":574,"copy":575,"range":576,"title":577,"component":571,"bar_percent":578},"fedf8c13-0805-4887-8e8b-bf41e96a4e3f","Participate in utility demand response programs and provide grid support during system emergencies.","50–200 /kW-year","Demand Response","60",{"_uid":580,"copy":581,"range":582,"title":583,"component":571,"bar_percent":584},"29478300-e545-449f-80ea-6ef76bf6d43d","Charge during low-price periods, discharge during high-price periods. Particularly valuable in ERCOT and CAISO markets.","Market-dependent","Energy Arbitrage","50",{"_uid":586,"copy":587,"range":588,"title":589,"component":571,"bar_percent":590},"8436562b-4528-4f91-a398-734b280b0e80","Frequency regulation, spinning reserves, and voltage support across multiple market structures.","$20–100 /kW-year","Ancillary Services","45","During a voltage ride-through event, the grid voltage drops to zero (true ZVRT event) while the AI&nbsp;UPS™ maintains perfectly stable load voltage at ~1.06 p.u. throughout. 10&nbsp;ms timestep. Drag to zoom, double-click to reset.","During rapid AI workload transients, the AI&nbsp;UPS™ absorbs load power swings using integrated energy storage, presenting a smooth grid-facing power profile. 10&nbsp;ms timestep. Drag to zoom, double-click to reset.","PROVEN VRT PERFORMANCE","Real data from our NLR full-scale testbed",[596,602,605,610,615,619,623],{"_uid":597,"aiups":598,"factor":599,"component":600,"traditional":601},"b64cc314-5fed-4705-924c-8563359ddce5","100% filtering","GPU Ripple","comparison_row","Buffering with ms delay",{"_uid":603,"aiups":242,"factor":241,"component":600,"traditional":604},"21384a80-fd09-480c-9729-63b55345f9b1","10–20 ms (STS)",{"_uid":606,"aiups":607,"factor":608,"component":600,"traditional":609},"3d242fc3-5c29-4cfc-8153-ee28852bb129","Integrated","Grid Compliance","Requires additional equipment",{"_uid":611,"aiups":612,"factor":613,"component":600,"traditional":614},"a18101ee-aa66-4679-aa8a-a92ace5cce79","Multiple streams","Revenue Generation","Limited (BESS only)",{"_uid":616,"aiups":617,"factor":553,"component":600,"traditional":618},"2028e9be-a42c-4089-9f38-a1c5c40202f9","Linear to multi-GW","Limited by LV architecture",{"_uid":620,"aiups":621,"factor":524,"component":600,"traditional":622},"0ed296bf-243f-4098-8f82-eef4946700d2","Single integrated system","Separate UPS & BESS systems",{"_uid":624,"aiups":625,"factor":626,"component":600,"traditional":627},"14c6a27a-dd4e-4521-8e35-56aed2b27506","Outdoor only","Space Requirements","Indoor UPS + outdoor BESS","PROVEN TRANSIENT MANAGEMENT",{"type":292,"content":630},[631],{"type":295,"attrs":632,"content":633},{"textAlign":183},[634],{"text":635,"type":300},"Conventional architectures rely on low-voltage UPS systems without grid-interactive capabilities, static transfer switches with non-zero transfer times, generators with seconds-long startup delays, and separate battery storage that doesn't provide UPS functionality. This fragmented approach creates protection gaps, compliance challenges, and missed economic opportunities.","Total Cost of Ownership","Traditional Approaches Fall Short","grid-safe-ai-ups-technology",-50,[],"db154322-85c9-473d-b6a8-af6a3546e4d0","2026-06-11T12:14:23.429Z","/solutions/grid-safe-ai-ups-technology",[],[],[],{"cache-control":196,"connection":197,"content-encoding":198,"content-type":199,"date":648,"etag":649,"referrer-policy":202,"sb-be-version":203,"server":204,"transfer-encoding":205,"vary":206,"via":650,"x-amz-cf-id":651,"x-amz-cf-pop":209,"x-cache":210,"x-content-type-options":211,"x-frame-options":212,"x-permitted-cross-domain-policies":213,"x-request-id":652,"x-runtime":653,"x-xss-protection":216},"Fri, 24 Jul 2026 19:54:13 GMT","W/\"e16b3a1cfef56415beea9a7ac02454e7\"","1.1 31018efa0f6c4b43ab018b8f561f340a.cloudfront.net (CloudFront)","uWgXwYjQz00nJagnPubkB5aWRe6KZMQprw4zM7tjKf27UecTaX7CNQ==","abdf7470-989b-4c68-aa16-6e2054459894","0.034291",1784922853321]